Construction Project Scheduling Optimization with Critical Path Method (CPM) and Precedence Diagram Method (PDM) (Case Study: PT Samara Insan Sentosa)

Nuke Maheswara Aji, Aina Nindiani, Weni Tri Sasmi, Mohammad Fadli Perdana

Abstract


Delays in construction projects often occur due to suboptimal scheduling, which results in increased costs and decreased efficiency. PT Samara Insan Sentosa faces a similar problem, where the planned project duration does not match the realization in the field. This study aims to optimize project scheduling using the Critical Path Method (CPM) and Precedence Diagram Method (PDM). The research methods used include secondary data analysis, interviews, and scheduling calculations with both methods. The results of the study show that CPM and PDM can identify critical paths and optimize project completion duration. A comparison of the two methods shows that PDM is more flexible than CPM, with a shorter project completion duration. Implementation of the PDM method can reduce project completion time without sacrificing the quality of work. The conclusion of this study is that scheduling optimization using the right method can increase project efficiency and reduce the risk of delays. The impact of this study can help companies improve the effectiveness of project management.


Full Text:

PDF

References


C. A. G. Lesbasa, M. Marantika, N. Maelissa, and R. Serang, “Halaman 1 ANALISA PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PDM (PRECEDENCE DIAGRAM METHOD) (Studi Kasus : Rehabilitasi dan Renovasi Sarana Prasarana SD,” J. Agreg., vol. 1, no. 1, pp. 1–8, 2022.

T. Syammaun, H. A. Rani, F. Rahmat, U. M. Aceh, J. M. No, and B. Aceh, “Optimalisasi Waktu dan Biaya dengan Metode Precedence Diagram Method ( Studi Kasus : Pembangunan Gedung Fisip Unsyiah ),” 2019.

P. D. H. Ardana and I. W. Sudiarsana, “Analisis Penjadwalan Ulang Menggunakan Metode Precedence Diagram Method Pada Proyek Pembangunan Ruang Kelas Baru Di Madrasah Tsanawiyah Negeri (Mtsn) Karangasem,” J. Ilm. MITSU (Media Inf. Tek. Sipil Univ. Wiraraja), vol. 11, no. 2, pp. 51–62, 2023, doi: 10.24929/ft.v11i2.2301.

A. C. Siregar and I. Iffiginia, “Penggunaan critical path method (CPM) untuk evaluasi waktu dan biaya pelaksanaan proyek,” Tek. J. Sains dan Teknol., vol. 15, no. 2, p. 102, Nov. 2019, doi: 10.36055/tjst.v15i2.6816.

E. Safitri, S. Basriati, and L. Hanum, “Optimasi Penjadwalan Proyek Menggunakan CPM dan PDM (Studi Kasus: Pembangunan Gedung Balai Nikah dan Manasik Haji KUA Kecamatan Kateman Kabupaten Indragiri Hilir),” J. Sains Mat. dan Stat., vol. 5, no. 2, pp. 17–25, 2019, [Online]. Available: https://ejournal.uin-suska.ac.id/index.php/ JSMS/article/view/7631

F. E. Koilam, A. K. T. Dundu, and T. T. Arsjad, “Perencanaan Waktu Penyelesaian Proyek Pembangunan Hotel Marron Resort Tomohon dengan Menggunakan Precedence Diagram Method,” J. Sipil Statik, vol. 8, no. 5, pp. 749–754, 2020, [Online]. Available: https://ejournal.unsrat.ac.id/index.php/jss/article/view/35033

M. A. Fikri, W. Tedja Bhirawa, S. Sanusi, and D. B. Arianto, “Evaluasi Penjadwalan Proyek Kantor Pada Pt Khc Dengan Menggunakan Metode Precedence Diagram Method,” 2013. doi: 10.35968/jtin.v12i2.1163.

K. A. Ariana et al., “Analisis Perbandingan Penjadwalan Menggunakan Critical Path Method (CPM) dengan Precedence Diagram Method (PDM) (Studi Kasus : Proyek Pembangunaan SD Negeri 5 Pecatu),” 2022. doi: 10.38043/telsinas.v4i1.374.

A. Nurhidayat, B. Arianto, and D. W. Tedja Bhirawa, “Optimalisasi Pembangunan Proyek Apartemen Sgc Cibubur Dengan Menggunakan Metode Precedence Diagram Method (Pdm),” 2013. doi: 10.35968/jtin/v11i1/706.

R. Aprilyanti, M. A. Rudiyanto, and W. Asriningpuri, “Analisa Perbandingan Critical Path Method (CPM) dan Precedence Diagram Method (PDM) Pada Proyek Pembangunan Pasar Kedungmaling Kabupaten Mojokerto,” 2020.

A. bin M. S. A. Muhammad, “Analisa Perhitungan Pekerjaan Reparasi Kapal Dengan Metode Critical Path Method (CPM),” 2020. doi: 10.35718/specta.v4i1.172.

Fahrian, B. Haryanto, and M. Jamal, “Perbandingan Penjadwalan Proyek Dengan Metode PDM (Precedence Diagram Method) & CPM (Critical Path Method) (Studi Kasus: Lanjutan Pembangunan Proyek Gedung SD Islamic Center Samarinda),” 2021.

S. U. E. Suhendar, “Pada Proyek Synthesis Residence Kemang,” vol. 03, no. 01, pp. 1–6, 2021.




DOI: http://dx.doi.org/10.24014/sitekin.v22i2.37258

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 SITEKIN: Jurnal Sains, Teknologi dan Industri




Editorial Address:
FAKULTAS SAINS DAN TEKNOLOGI
UIN SULTAN SYARIF KASIM RIAU

Kampus Raja Ali Haji
Gedung Fakultas Sains & Teknologi UIN Suska Riau
Jl.H.R.Soebrantas No.155 KM 18 Simpang Baru Panam, Pekanbaru 28293
Email: sitekin@uin-suska.ac.id
© 2023 SITEKIN, ISSN 2407-0939

SITEKIN Journal Indexing:

Google Scholar | Garuda | Moraref | IndexCopernicus | SINTA


Creative Commons License
SITEKIN by http://ejournal.uin-suska.ac.id/index.php