Analysis of Spare Parts Inventory Planning for Machinery with Monte Carlo Simulation, Reorder Point, and Safety Stock
Abstract
PT. XYZ is a company engaged in the management of mall buildings. The implementation of operations in malls often experiences obstacles, namely the availability of machine spare parts which is less than 95% of the standard inventory availability. The impact of this problem is the ability of PT. XYZ in meeting the needs of consumers. The results of observations and interviews with supervisors show that there is a lack of stock of escalator spare parts, especially for Sigma brands such as Ballasstrude Newel Chain Roller Escalator Sigma Vera, Roller Press Handrail (70x60) Sigma Ares, Roller Press Handrail Escalator Sigma Vera and Roller Step ESC Sigma (6204). This study compares three forecasting methods: exponential smoothing, linear regression, and Monte Carlo simulation. The stages of the research consist of problem identification, determination of data patterns, inventory planning with montecarlo simulations, raw material planning with safety stock and reorder points. The results of this study were obtained that the best method to handle this case was Monte Carlo simulation because it has a high level of accuracy compared to other methods. The accuracy result obtained was a Mean Absolute Percentage Error (MAPE) of 17.03%. The results of the Montecarlo simulation obtained safety stock of 9-16 units and reorder points of 18-28 units. This research can reduce delays in fulfilling production demand, if safety stock and reorder point policies can be implemented.
Full Text:
PDFReferences
F. Fauzi and H. Herindiyati, “TINJAUAN PUSAT PERBELANJAAN DI KOTA JAKARTA DARI BERBAGAI ASPEK ARSITEKTUR,” Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri, vol. 5, no. 1, pp. 45–66, 2022, doi: 10.37721/KALIBRASI.V5I1.972.
D. Nur Prakoso, Y. Prasetyo, B. Winarno, B. Triyono, P. Teknik Listrik, and J. Teknik Politeknik Negeri Madiun, “Design System Warning & Safety Escalator dengan HMI Berbasis PLC,” JTEIN: Jurnal Teknik Elektro Indonesia, vol. 4, no. 2, pp. 490 – 501–490 – 501, Aug. 2023, doi: 10.24036/JTEIN.V4I2.356.
S. Anggraeni and J. Arifin, “Peramalan Permintaan Printing Menggunakan Metode Double Exponential Smoothing dan Pengujian Hasil Menggunakan Grafik Tracking Signal pada PT. XYZ,” Jurnal Ilmiah Wahana Pendidikan, vol. 8, no. 13, pp. 430–439, Aug. 2022, doi: 10.5281/ZENODO.6962720.
Yusmaity, J. Santony, and Y. Yunus, “Simulasi Monte Carlo untuk Memprediksi Hasil Ujian Nasional (Studi Kasus di SMKN 2 Pekanbaru),” Jurnal Informasi dan Teknologi, vol. 1, no. 4, pp. 1–6, Dec. 2019, doi: 10.37034/JIDT.V1I4.21.
R. Rahim and R. N. Fuad, “APLIKASI DALAM SIMULASI PENJUALAN DENGAN MENGGUNAKAN METODE MONTE CARLO,” Ready Star, vol. 2, no. 1, pp. 235–239, Nov. 2019, Accessed: Sep. 05, 2023. [Online]. Available: https://ptki.ac.id/jurnal/index.php/readystar/article/view/61
H. Hazimah, Y. A. Sukanto, and N. A. Triwuri, “Analisis Persedian Bahan Baku, Reorder Point dan Safety Stock Bahan Baku ADC-12,” Jurnal Ilmiah Universitas Batanghari Jambi, vol. 20, no. 2, pp. 675–681, Jul. 2020, doi: 10.33087/jiubj.v20i2.989.
D. S. Fahlevi, M. Zaky, and A. Nadifa, “ANALISIS PERENCANAAN PERSEDIAAN SPAREPART DENGAN PENDEKATAN METODE SIMULASI MONTECARLO PADA PT PUPUK ISKANDAR MUDA,” Jurnal Industri Samudra, vol. 3, no. 2, pp. 9–9, Oct. 2022, Accessed: Oct. 09, 2023. [Online]. Available: https://ejurnalunsam.id/index.php/jis/article/view/6934
R. Santoso and F. Santoso, “PERANCANGAN SISTEM INFORMASI MANAJEMEN PERSEDIAAN BARANG PADA PT.KENCANA MITRA TINELO JAKARTA,” Indonesian Journal of Networking and Security (IJNS), vol. 10, no. 3, Sep. 2021, doi: 10.55181/IJNS.V10I3.1728.
L. Lutfiana Indriyana Puspitosari, “Analisis Manajemen Persediaan UMKM Jazid Bastomi Batik di Purworejo,” Jurnal Ekonomi Syariah, Akuntansi, dan Perbankan, vol. 4, no. 1, pp. 55–66, 2020, Accessed: Sep. 24, 2023. [Online]. Available: https://www.neliti.com/publications/326625/
A. Afifah Muhartini, O. Sahroni, S. Dwi Rahmawati, T. Febrianti, and I. Mahuda, “ANALISIS PERAMALAN JUMLAH PENERIMAAN MAHASISWA BARU DENGAN MENGGUNAKAN METODE REGRESI LINEAR SEDERHANA,” Jurnal Bayesian : Jurnal Ilmiah Statistika dan Ekonometrika, vol. 1, no. 1, pp. 17–23, Mar. 2021, doi: 10.46306/BAY.V1I1.2.
R. Raihan, M. S. Effendi, and A. Hendrawan, “Forcasting Model Exsponensial Smoothing Time Series Rata Rata Mechanical Availability Unit Off Highway Truck CAT 777D Caterpillar,” POROS TEKNIK, vol. 8, no. 1, pp. 1–9, 2016, doi: 10.31961/POROSTEKNIK.V8I1.375.
A. M. Ajeng, S. Oman, D. R. Septi, F. Tanti, and M. Isnaini, “ANALISIS PERAMALAN JUMLAH PENERIMAAN MAHASISWA BARU DENGAN MENGGUNAKAN METODE REGRESI LINEAR SEDERHANA,” Jurnal Bayesian : Jurnal Ilmiah Statistika dan Ekonometrika, vol. 1, no. 1, pp. 17–23, Mar. 2021, doi: 10.46306/BAY.V1I1.2.
I. Syata, T. Azisah Nurman, and A. Nabilla Baroqah Adnan, “Simulasi Monte Carlo Dalam Meramalkan Pola Permintaan Tanaman Hias Melalui Usaha Rumahan di Tengah Pandemi Covid 19,” Jurnal Matematika dan Statistika serta Aplikasinya , vol. 10, no. 2, pp. 79–84, Dec. 2022, doi: 10.24252/MSA.V10I2.32401.
W. N. Cahyo, “PENDEKATAN SIMULASI MONTE CARLO UNTUK PEMILIHAN ALTERNATIF DENGAN DECISION TREE PADA NILAI OUTCOME YANG PROBABILISTIK,” scholar.archive.org, vol. 13, no. 2, pp. 11–17, 2008, Accessed: Oct. 05, 2023. [Online]. Available: https://scholar.archive.org/work/ylhphkwo6rh4nmozlienzbxrim/access/wayback/http://jurnal.uii.ac.id/jurnal-teknoin/article/download/791/709
M. B. Giles, “Multilevel Monte Carlo methods,” Acta Numerica, vol. 24, pp. 259–328, Apr. 2015, doi: 10.1017/S096249291500001X.
R. Prawita, “Simulasi Metode Monte Carlo dalam Menjaga Persediaan Alat Tulis Kantor,” Jurnal Informatika Ekonomi Bisnis, pp. 72–77, Jun. 2021, doi: 10.37034/INFEB.V3I2.69.
I. Setiawan, “RANCANG BANGUN APLIKASI PERAMALAN PERSEDIAAN STOK BARANG MENGGUNAKAN METODE WEIGHTED MOVING AVERAGE (WMA) PADA TOKO BARANG XYZ,” Jurnal Teknik Informatika, vol. 13, no. 3, pp. 1–9, 2021, Accessed: Jun. 07, 2024. [Online]. Available: https://ejurnal.ulbi.ac.id/index.php/informatika/article/view/1664
M. Sultan, J. Maulana, and A. Syakhroni, “PERAMALAN PERMINTAAN GULA BULK DAN GULA KEMAS MENGGUNAKAN METODE WINTER’S EXPONENTIAL SMOOTHING DI PT. XYZ,” JURNAL LOGISTICA, vol. 2, no. 1, pp. 1–6, Dec. 2023, Accessed: Jun. 28, 2024. [Online]. Available: https://journal.iteba.ac.id/index.php/logistica/article/view/157
F. Ahmad, “PENENTUAN METODE PERAMALAN PADA PRODUKSI PART NEW GRANADA BOWL ST Di PT.X,” JISI: Jurnal Integrasi Sistem Industri, vol. 7, no. 1, pp. 31–39, May 2020, doi: 10.24853/JISI.7.1.31-39.
I. Sungkawa and T. R. Megasari, “Penerapan Ukuran Ketepatan Nilai Ramalan Data Deret Waktu dalam Seleksi Model Peramalan Volume Penjualan PT Satriamandiri Citramulia,” ComTech: Computer, Mathematics and Engineering Applications, vol. 2, no. 2, pp. 636–645, Dec. 2011, doi: 10.21512/COMTECH.V2I2.2813.
D. Misbachul Umami, M. Fuad Fauzul Mu, and R. Rakhmawati, “ANALISIS EFISIENSI BIAYA PERSEDIAAN MENGGUNAKAN METODE EOQ (ECONOMIC ORDER QUANTITY) PADA PT. XYZ,” JURNAL AGROTEKNOLOGI, vol. 12, no. 01, pp. 64–70, Jun. 2018, doi: 10.19184/J-AGT.V12I1.8100.
M. N. Piranti and A. Sofiana, “Kombinasi Penentuan Safety Stock Dan Reorder Point Berdasarkan Analisis ABC sebagai Alat Pengendalian Persediaan Cutting Tools (Studi Kasus: PT. XYZ),” Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, vol. 7, no. 1, pp. 69–78, Jun. 2021, Accessed: Nov. 03, 2023. [Online]. Available: https://ejournal.uin-suska.ac.id/index.php/jti/article/view/12243
R. Wahyudi, “Analisis pengendalian persediaan barang berdasarkan metode eoq di Toko Era Baru Samarinda,” ejournal.hi.fisip-unmul.ac.idR WahyudiEjournal Ilmu Admistrasi Bisnis, 2015•ejournal.hi.fisip-unmul.ac.id, vol. 2, no. 1, pp. 162–173, 2015, Accessed: Jun. 05, 2024. [Online]. Available: https://ejournal.hi.fisip-unmul.ac.id/site/wp-content/uploads/2015/03/E-journaL%20PDF%20(03-04-15-03-58-13).pdf
M. Hudori, “Formulasi Model Safety Stock dan Reorder Point untuk Berbagai Kondisi Persediaan Material,” Jurnal Citra Widya Edukasi Vol X No. 3 Desember 2018 ISSN. 2086-0412. Accessed: Jun. 26, 2024. [Online]. Available: https://www.researchgate.net/publication/334442191_Formulasi_Model_Safety_Stock_dan_Reorder_Point_untuk_Berbagai_Kondisi_Persediaan_Material
G. Gilang Kencana, “Analisis Perencanaan dan Pengendalian Persediaan Obat Antibiotik di RSUD Cicalengka Tahun 2014,” Jurnal Administrasi Rumah Sakit Indonesia, vol. 3, no. 1, May 2018, Accessed: Nov. 03, 2023. [Online]. Available: https://journal.fkm.ui.ac.id/arsi/article/view/2211
DOI: http://dx.doi.org/10.24014/sitekin.v22i2.36921
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 SITEKIN: Jurnal Sains, Teknologi dan Industri
![]() | Editorial Address: FAKULTAS SAINS DAN TEKNOLOGI UIN SULTAN SYARIF KASIM RIAU Kampus Raja Ali Haji Gedung Fakultas Sains & Teknologi UIN Suska Riau Jl.H.R.Soebrantas No.155 KM 18 Simpang Baru Panam, Pekanbaru 28293 ![]() © 2023 SITEKIN, ISSN 2407-0939 |
SITEKIN Journal Indexing:
Google Scholar | Garuda | Moraref | IndexCopernicus | SINTA
SITEKIN by http://ejournal.uin-suska.ac.id/index.php