Analysis on Construction Cost Estimation Ministry Regulation Year 2016 and Year 2022 for Construction Projects

Andi Bayu Putra, Oki Setyandito

Abstract


Cost is one of the 3 most important project management components, with the other two being Quality and Time. The calculation of construction work costs in detail is regulated in Indonesia by a Ministry  Regulation. This Ministry  Regulation has only undergone changes in 2022, which replaces and/or fixes several existing rules in the previous Regulation issued in 2016. For brevity, the two Regulations is shortened to regulation 2016 and regulation 2022. Of course, the accuracy of these regulations is especially important regarding the smooth implementation of projects. This study uses the two Ministry  Regulations on two different Construction Projects to see analyse the different result of cost calculation caused by the regulation change. This change itself is important to be understood to continuously improve the Ministry  Regulation regarding cost estimation. In conclusion, regulation 2022 can produce a more accurate results, with regulation 2016 often gives a higher cost estimation than regulation 2022. For future research it is best to analyse other type of construction infrastructure to gain more insight into which estimation that can still be improved in the future.


Full Text:

PDF

References


Project Management Institute, "Success in disruptive times: expanding the value delivery landscape to address the high cost of low performance. In Pulse of the Profession.," 2018. [Online]. Available: https://www.pmi.org/learning/thought-leadership/pulse/pulse-of-the-profession-2018.

P. A. Eman, L. Elisabeth and F. Jansen, "Estimasi Biaya Konstruksi Menggunakan Metode Parameter Pada Proyek Pemeliharaan Berkala Jalan Di Kota Manado," Jurnal Ilmiah Media Engineering, vol. 8, no. 2, 2018.

M. W. Fazil, C. . K. Lee and P. F. M. Tamyez, "Cost Estimation Performance In The Construction Projects: A Systematic Review And Future Directions," International Journal Of Industrial Management (Ijim), vol. 11, no. 1, pp. 217-234, 2021.

R. D. Yap, Analisa Perbandingan Harga Satuan Pekerjaan Berdasarkan Metode SNI dengan Biaya Produktivitas Tenaga Kerja di Lapangan., Bali: Universitas Udayana, 2015.

A. N. a. N. E.N.Hidayah, "Studi Komparasi Analisis Harga Satuan PekerjaanJalan Kabupaten Metode K danAHSP," The 9th UniversityResearch Colloqium 2019, p. 88, 2019.

Kementerian Pekerjaan Umum dan Perumahan Rakyat, Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 1 Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat, Jakarta, 2022.

B. Pilutomo and H. R. Agustapraja, "Perbandingan Estimasi Anggaran Biaya Antara Metode Bow, Sni Dan Perhitungan Kontraktor," JUTEKS - JURNAL TEKNIK SIPIL, vol. 5, no. 1, pp. 55-66, 2020.

S. A. Widodo, K. Yakin and W. A. Nugroho, "Analisis Perbandingan Nilai Proyek Dengan Standar Nasional Indonesia (SNI) dan Harga Satuan Pokok Kegiatan (HSPK) (Studi Kasus: SDN Kedung Cowek Baru)," Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, vol. 3, no. 1, 2020.

N. Alami, U. A. Aziz and D. Margiarti, "Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI)," Jurnal Surya Beton, vol. 3, no. 1, 2021.

S. F. Yanuar, N. S. Rizal and T. Abadi, Jurnal Rekayasa Infastruktur HEXAGON, vol. 7, no. 1, 2022.

A. Wahyuningtyas and S. Wacono, "Perbandingan Analisis Harga Satuan Pekerjaan Dinding Proyek Royal Sentul Park," in Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, Jakarta, 2019.

A. O. Putri, N. B. Prihutomo and E. Pramono, "Analisis Harga Satuan Pekerjaan Pelapisan Ulang Ac-Wc Ruas Tol Jagorawi," Construction and Material Journal, vol. 3, no. 3, 2021.

Sugiyono, Metode Penelitian Kuantitatif Kualitatif dan R&D, Bandung: Alfabeta Bandung, 2019.

S. Hyun-Ji, J. Ahn, H.-S. Lee and K. Han, "Cost Estimation Model Using Modified Parameters for Construction Projects," Hindawi Advances in Civil Engineering, vol. 2019, 2019.

Kementerian Pekerjaan Umum dan Perumahan Rakyat, Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28/PRT/M/2016 Tahun 2016 tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum, Jakarta: Kementerian PUPR, 2016.

M. Fajar, Analisis Perbandingan Biaya dan Waktu Pengecoran Menggunakan Concrete Pump dan Concrete Bucket, Yogyakarta: Universitas Islam Indonesia., 2019.




DOI: http://dx.doi.org/10.24014/sitekin.v20i2.21790

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 SITEKIN: Jurnal Sains, Teknologi dan Industri




Editorial Address:
FAKULTAS SAINS DAN TEKNOLOGI
UIN SULTAN SYARIF KASIM RIAU

Kampus Raja Ali Haji
Gedung Fakultas Sains & Teknologi UIN Suska Riau
Jl.H.R.Soebrantas No.155 KM 18 Simpang Baru Panam, Pekanbaru 28293
Email: sitekin@uin-suska.ac.id
© 2023 SITEKIN, ISSN 2407-0939

SITEKIN Journal Indexing:

Google Scholar | Garuda | Moraref | IndexCopernicus | SINTA


Creative Commons License
SITEKIN by http://ejournal.uin-suska.ac.id/index.php