Designing Vendor Performance Criteria Using Analytic Hierarchy Process Method On The Engineering Procurement Construction Project Company

Annisa Nursyahbani, Atya Nur Aisha, Intan Permatasari

Abstract


Indonesia's electrical power supply is insufficient to meet the population's demands. Therefore, the rise of Renewable Energy (RE) is anticipated to fulfill the needs. One of Indonesia's renewable energy industries implementing project management in its operations encountered delays in its engineering procurement construction project due to material delay, and the project's quality failed to meet requirements due to an incompetent vendor. Furthermore, the existing key performance indicators were insufficiently comprehensive, lacked criteria related to business permits, and had unclear Critical Success Factors (CSF). The primary goal was to develop narrowly focused criteria to evaluate vendor construction performance through Multi-Criteria Decision-Making (MCDM). The Analytical Hierarchy Process (AHP) method is one of the techniques utilized in MCDM to determine the ranking of alternatives based on selection criteria that have hierarchical interdependence relationships. This study produced six main criteria based on literature studies, including management capability, financial capability, quality, delivery time, customer services, and safety. The most important sub-criteria from the results of this study are speed and accuracy of delivery time with a weight of 23,90%, where the factor of completing the project activity on time is a key factor for project success. For further handling, this criterion is considered as CSF for vendor selection at EPC projects, especially in the RE industry.

 

Keywords: Analytic Hierarchy Process (AHP), Key Performance Indicator (KPI), Project Management, Procurement Management, Vendor


Full Text:

PDF

References


J. E. Elektro, H. B. Nurjaman, and T. Purnama, “Pembangkit Listrik Tenaga Surya (PLTS) Sebagai Solusi Energi Terbarukan Rumah Tangga.” [Online]. Available: https://journal.uny.ac.id/index.php/jee

K. P. Aprilianti, N. A. Baghta, D. R. Aryani, F. H. Jufri, and A. R. Utomo, “Potential assessment of solar power plant: A case study of a small island in Eastern Indonesia,” in IOP Conference Series: Earth and Environmental Science, IOP Publishing Ltd, Nov. 2020. doi: 10.1088/1755-1315/599/1/012026.

Project Management Institute, A guide to the project management body of knowledge.

E. Favari, “Edoardo Favari Project Management Leading Change in the Age of Complexity.”

K. Piwowar-Sulej, M. Sołtysik, S. Jarosz, and R. Pukała, “The Linkage between Renewable Energy and Project Management: What Do We Already Know, and What Are the Future Directions of Research?,” Energies (Basel), vol. 16, no. 12, Jun. 2023, doi: 10.3390/en16124609.

I. Baihaqi and C. Utomo, “Causes of Delay in EPC Projects: The Case of Indonesia,” vol. 14, no. 2, 2024.

G. Mejía, O. Sánchez, K. Castañeda, and E. Pellicer, “Delay causes in road infrastructure projects in developing countries”, doi: 10.7764/RDLC.19.2.220.

V. H. L. Saputri and Nasrulloh, “SEM Analysis of Contractor Performance in Accelerating Electrical Construction Project: Insights from Herzberg’s Dual Factor Theory,” Jurnal Optimasi Sistem Industri, vol. 23, no. 1, pp. 15–28, Jul. 2024, doi: 10.25077/josi.v23.n1.p15-28.2024.

“Parmenter, David - Key Performance Indicators_ Developing, Implementing, and Using Winning Kpis-Wiley (2019)”.

T. Penentuan, S. Daya, and S. Kerajinan Bordir, “Analytical Hierarchy Process (AHP).”

C. S. Tang, “Springer Series in Supply Chain Management Volume 22 Series Editor.”

T. L. Saaty and L. G. (Luis G. Vargas, Models, methods, concepts & applications of the analytic hierarchy process. Springer, 2012.

S. T. Mhlanga and M. Lall, “Influence of Normalization Techniques on Multi-criteria Decision-making Methods,” in Journal of Physics: Conference Series, IOP Publishing Ltd, Apr. 2022. doi: 10.1088/1742-6596/2224/1/012076.

B. Rafles Manurung and F. Ramadhan, “ISSN [e]: Xxxx-Xxx Pemilihan Lokasi Kedai Kopi Menggunakan Metode Analytical Hierarchy Process (Ahp) Dan Simple Additive Weighting (SAW).”

H. A. Shume and B. B. Mitikie, “An integrated Delphi and Fuzzy AHP model for contractor selection: a case of Addis Ababa Design and Construction Works Bureau,” Cogent Eng, vol. 11, no. 1, 2024, doi: 10.1080/23311916.2024.2357724.

A. B. Lestari and D. Mahdiana, Penerapan Metode Analitycal Hierarchy Process Dan Simple Multi Attribute Rating Technique Untuk Pemilihan Supplier Terbaik.

A. Nuroni, D. Pratami, and G. N. Sandhy Widyasthana, “Decision Making Process Design In Vendor Selection Using Ethical Decision Making Framework In Fiber To The Home Contstruction Project.”

O. S. D. Alshamrani, M. Saleem, I. K. AlYousif, and A. Alluqmani, “Development of a pre-qualification and selection framework for construction projects’ contractors in Saudi Arabia,” Journal of Asian Architecture and Building Engineering, vol. 22, no. 3, pp. 1545–1563, 2023, doi: 10.1080/13467581.2022.2087657.

H. A. El-khalek, R. F. Aziz, and E. S. Morgan, “Identification of construction subcontractor prequalification evaluation criteria and their impact on project success,” Alexandria Engineering Journal, vol. 58, no. 1, pp. 217–223, Mar. 2019, doi: 10.1016/j.aej.2018.11.010.

J. Ameh and I. O. Kayode, “Impact Of Contractors’ Prequalification Criteria (CPC) On Time Performance In Construction Projects Execution.” [Online]. Available: https://www.researchgate.net/publication/374628350

N. John, “Contractor Selection Criteria and Road Construction Project Success in Rivers State,” 2022. [Online]. Available: https://www.gacpbs.com/diamondbridge-economics-and-business-journal/

Ivander, “Penilaian dan Pemilihan Vendor dengan Pendekatan Metode AHP dalam Industri Retail”.

H. Irawan, I. Teknologi, and A. Tama, “Strategi Pemilihan Vendor Transportasi Dengan Metode Sink’s Seven Performance Melalui Pembobotan Ahp Dan Smart.” [Online]. Available: https://journal-mandiracendikia.com/jip-mc

Y. Han, W. K. Chong, and D. Li, “A Systematic Literature Review of the Capabilities and Performance Metrics of Supply Chain Resilience.”

“The Measurement of Key Performance Indicators (KPI) at Final Assembly Line and Delivery Center Division Using Sink’s Seven Performance Criteria Method in Indonesian Aerospace Industry,” International Journal of Emerging Trends in Engineering Research, vol. 8, no. 9, pp. 5619–5623, Sep. 2020, doi: 10.30534/ijeter/2020/115892020.

Peraturan Mentri Pekerjaan Umum dan Perumahan Rakyat (PUPR) Nomor 08 Tahun 2019 Tentang Pedoman Pelayanan Perizinan Usaha Jasa Konstruksi Nasional. 2019.

Peraturan Pemerintah Republik Indonesia Nomor 5 Tahun 2021 Tentang Penyelenggaraan Perizinan Berusaha Berbasis Risiko. 2021.




DOI: http://dx.doi.org/10.24014/jti.v10i2.32395

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Annisa Nursyahbani, Atya Nur Aisha, Intan Permatasari

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

                                                                                                                                                                                                                                     

Jurnal Teknik Industri

P-ISSN 2460-898X | E-ISSN 2714-6235

Published by:

Industrial Engineering Department

Universitas Islam Negeri Sultan Syarif Kasim Riau, Indonesia

Office Address:

H.R. Soebrantas KM 15.5, Tampan, Pekanbaru, Riau, Indonesia 28293

email: jti.fst@uin-suska.ac.id

 

Indexed by:

      

       

 

Creative Commons License

 

JTI : Jurnal Teknik Industri under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.