Evaluating Alternative Investment Options for Grinding Machines Using the Incremental Cost Method
Abstract
production capacity constraints. A key issue is the limited capacity of the grinding machine, which frequently overheats, leading to production delays and exceeding standard working hours. To address this problem, an investment in an additional grinding machine is proposed. A feasibility study was conducted by analyzing market, technical, and financial aspects using Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PBP). The results showed an NPV of IDR 4,824,298,738, an IRR of 34.72%, and a PBP of 3.85 years, indicating the investment’s feasibility. Additionally, an incremental cost analysis was performed to compare the existing condition with the proposed alternative, yielding a ∆ROR of 98%, which exceeds the Minimum Attractive Rate of Return (MARR) of 11.01%. These findings confirm that adding a grinding machine is the most viable alternative to enhance production capacity, accommodate growing demand, and improve operational efficiency. By implementing this investment, the company can optimize its production process, reduce overtime costs, and ensure a stable supply to meet market needs. The feasibility study provides valuable insights for decision-making in similar industries facing production limitations due to equipment constraints.
Keywords: Feasibility Analysis, Incremental Cost Analysis, NPV, IRR, PBP
Full Text:
PDFReferences
“Website DJKN.” [Online]. Available: https://www.djkn.kemenkeu.go.id/kanwil-suluttenggomalut/baca-artikel/15588/Kondisi-Industri-Pengolahan-Makanan-dan-Minuman-di-Indonesia.html
Asiva Noor Rachmayani, “Profil Industri Pengolahan Mikro Dan Kecil Kabupaten Banjarnegara 2024,” p. 6, 2015.
Y. C. Nugroho et al., “Rancangan Perbaikan Alur Proses Produksi Obat P di PT . XYZ untuk Mengurangi Waktu Proses dengan Mtode Business Process Improvement Design Refinement for PT . XYZ ’ S Medicine P Production Process Flow to Reduce Process Time Using Business Process Improve,” vol. 10, no. 3, pp. 3000–3006, 2023.
D. S. Hasan, D. Elpisah, D. J. Sabtohadi, D. Zarkasi, and D. H. Fachrurazi, Studi Kelayakan Bisnis, konsep dasar studi kelayakan bisnis. 2022.
D. Lusianti, K. T. Fahira, and D. I. A. Naimi, Studi Kelayakan Bisnis Teknik Menganalisis Kelayakan Rencana Bisnis, 1st ed. Pekalongan.
O. Arifudin, Y. Sofyan, and R. Tanjung, “Studi Kelayakan Bisnis Telur Asin H-Organik,” J. Ecodemica J. Ekon. Manajemen, dan Bisnis, vol. 4, no. 2, pp. 341–352, 2020, doi: 10.31294/jeco.v4i2.8199.
R. F. Yunus, N. Suryana, and S. Aryani, “Analisis Kelayakan Usaha Pembukaan Cabang Kedai Kinetik Di Feasibility Analysis of Opening New Branch of Kedai Kinetik Reviewed From Market Aspects , Technical Aspects , and Financial Aspects,” e-Proceeding Eng., vol. 7, no. 2, pp. 5181–5186, 2020.
K. Auliasari, M. Kertaningtyas, and M. Kriswantono, “Penerapan Metode Peramalan untuk Identifikasi Permintaan Konsumen,” INFORMAL Informatics J., vol. 4, no. 3, p. 121, 2020, doi: 10.19184/isj.v4i3.14615.
Z. I. Vindari, W. Wahyudin, A. G. Azzahra, S. P. Khan, and S. M. Ayuningtyas, “Analisis Peramalan Permintaan pada Part Arm Rear Brake KWBF di PT Ciptaunggul Karya Abadi,” J. Serambi Eng., vol. VIII, no. 1, pp. 4284–4293, 2023.
R. A. Purnomo, Riawan, and L. O. Sugianto, Studi Kelayan Bisnis. 2017.
Martha Sinawangresmi Setiasih, M. Wullur, and J. S. B. Sumarauw, “Analisis Proses Produksi Di Cv. Anugerah Persada Teknik, Di Sepanjang, Jawa Timur,” J. EMBA J. Ris. Ekon. Manajemen, Bisnis dan Akunt., vol. 11, no. 1, pp. 12–22, 2023, doi: 10.35794/emba.v11i1.45642.
N. P. D. Arwini, “Roti, Pemilihan Bahan Dan Proses Pembuatan,” J. Ilm. Vastuwidya, vol. 4, no. 1, pp. 33–40, 2021, doi: 10.47532/jiv.v4i1.249.
C. Meissy et al., “Analisis Efisiensi Tata Letak (Layout) Fasilitas Produksi Pt Tropica Cocoprima Lelema,” J. EMBA J. Ris. Ekon. Manajemen, Bisnis dan Akunt., vol. 7, no. 4, pp. 5466–5475, 2019.
F. K. Wardana, M. Qomaruddin, and W. Mas Soeroto, “Analisis Kelayakan Investasi Dengan Pendekatan Aspek Financial Dan Strategi Pemasaran Pada Program Ayam Petelur Di Bum Desa Bumi Makmur,” Sebatik, vol. 25, no. 2, pp. 318–325, 2021, doi: 10.46984/sebatik.v25i2.1633.
A. R. Safitri, A. Haya, and H. Alkatiri, “Analisis Biaya Produksi Jaw Crusher PE-600x900 Pada PT. Intimkara Kecamatan Oba Utara Kota Tidore Kepulauan Provinsi Maluku Utara,” J. GEOMining, vol. 2, no. 2, pp. 61–66, 2021, [Online]. Available: http://ejournal.unkhair.ac.id/index.php/geomining/article/view/3924
H. Sulistiani, E. E. Yanti, and R. D. Gunawan, “Penerapan Metode Full Costing pada Sistem Informasi Akuntansi Biaya Produksi (Studi Kasus: Konveksi Serasi Bandar Lampung),” J. Ilm. Sist. Inf. Akunt., vol. 1, no. 1, pp. 35–47, 2021, doi: 10.33365/jimasia.v1i1.858.
M. M. Amshari, “Analisis Biaya Dan Efisiensi Produksi Dalam Ekonomi Islam,” Balanc. J. Ekon. dan Bisnis Islam, vol. 1, no. 1, pp. 133–148, 2019, doi: 10.35905/balanca.v1i1.1043.
A. Yanti and F. Nurhidayah, “Pentingnya Pemahaman Akuntansi Sederhana Sebagai Solusi Untuk Menyusun Laporan Keuangan (Studi kasus pada UD Rian Arianto Farm),” J. Akunt., vol. 9, no. 2, pp. 183–193, 2020, [Online]. Available: http://ejournal.stiemj.ac.id/index.php/akuntansi186
G. Harini, Y. Syamra, and P. Setiawan, “Pengaruh Insentif Pajak , Pajak , dan Cash Flow terhadap Konservatisme,” J. Manaj. Dan Kewirausahaan, vol. 1, no. Januari, pp. 10–23, 2020.
N. Yulianasari, “Analisis Penerapan Penyusunan Laporan Keuangan Pada Usaha Kecil dan ,Menengah (UKM) Berbasis Standar Akuntasi Dalam Memperoleh Pembiayaan Kredit (Studi Kasus di Sentral Oleh-oleh Cita Rasa Kota Bengkulu),” Junar Akunt. Unihaz, vol. 3, no. 1, pp. 51–65, 2020.
I. A. Hasugian, F. Ingrid, and K. Wardana, “Analisis Kelayakan Dan Sensitivitas : Studi Kasus Ukm Mochi Kecamatan Medan Selayang,” Cetak) Bul. Utama Tek., vol. 15, no. 2, pp. 1410–4520, 2020.
H. Sidiq and F. Mukarrom, “Penilaian Kelayakan Ekonomi Investasi Peralatan Tambang Menggunakan Metode Incremental Cost (Studi Kasus: Excavator Doosan Dx 340 Lc-5),” Kurvatek, vol. 4, no. 1, pp. 89–93, 2019, doi: 10.33579/krvtk.v4i1.1118.
D. G. Newman, Engineering Economics Analysis, 9th ed. 2009.
A. R. Ambararum et al., “Analisis Kelayakan Pembukaan Depot Air Minum Isi,” eProceedings …, vol. 7, no. 2, pp. 5097–5103, 2020, [Online]. Available: https://openlibrarypublications.telkomuniversity.ac.id/index.php/engineering/article/view/12033
R. Faerus, A. Farisi, M. E. T. Chumaidiyah, and M. Dellarosawati, “Analisis Penambahan Lini Produksi Jahit Pada Cv. Era Printing Indonesia Dengan Metode Incremental Cost Analysis of Addition of Sewing Production Lines in Cv. Era Printing Indonesia With Incremental Cost Method,” vol. 6, no. 2, p. 6071, 2019, [Online]. Available: https://openlibrarypublications.telkomuniversity.ac.id/index.php/engineering/article/download/9691/9559
DOI: http://dx.doi.org/10.24014/jti.v10i2.32030
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Fatayaturrokhma Ilmala Arifah, Endang Chumaidiyah, Nanang Suryana

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Jurnal Teknik Industri
P-ISSN 2460-898X | E-ISSN 2714-6235
Published by:
Industrial Engineering Department
Universitas Islam Negeri Sultan Syarif Kasim Riau, Indonesia
Office Address:
H.R. Soebrantas KM 15.5, Tampan, Pekanbaru, Riau, Indonesia 28293
email: jti.fst@uin-suska.ac.id
Indexed by:
JTI : Jurnal Teknik Industri under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.