Analisis Kelayakan Investasi Penambahan Mesin Oven pada Industri Pengolahan Kayu Cv. Riau Pallet

Dewi Diniaty, Kurnia Irma Gustia Nova

Abstract


CV. Riau Pallet is one private company in Pekanbaru, located on Jl. Kubang Raya Pekanbaru Panam. CV. Riau Pallet is a manufacturing company engaged in the processing of forest timber into a pallet. Pallet size produced by the company there are several types, the company usually produces pallet according to the demand of the consumer, and the type of pallet measuring 94 cm X 113 cm most into consumer demand. Judging from the development, the company has a number of concerns regarding the production of unmet consumer demand, where demand is higher than production, which resulted in the achievement of production targets by the company. It is caused by a finishing process that occurred in the engine oven. The oven is used for the drying process is still manual pallet, namely the drying process using a furnace that takes a long time, about 10-12 hours each one the drying process. This leads to not achieving the target production expected by the company. In addition the rate of disability in the process of finishing in the oven machine is very high. Additionally happened piling pallets waiting for their turn to the finishing stage. To overcome these problems, the need for the addition of a new oven at the company's engine. This study aims to analyze the feasibility of adding machine industry a new oven at the company and determine the feasibility of an investment based on technical aspects and financial aspects. From the data processing can be seen that the technical aspects of data processing made at the planning association or relationship Activity Relationship Chart (ARC) obtained Area Allocation Diagram (AAD) as the proposed layout of the room for the addition of new machines on the CV. Riau Pallet. On the financial aspect that has been done, it can be concluded that the NPV of USD 639 329 829, -, the value of MARR of 11%, IRR of 11.4%, and the value payback period or return on capital investment is for 1 year and 6 months. So that additional investment feasibility analysis on a company machine oven feasible.
Keywords : investment feasibility analysis, wood processing industry, NPV, IRR, payback period

Full Text:

PDF

References


Aditya, S. A., Bakar, Abu., Fitria, Lisye, 2014, ‘Analisis Kelayakan Usaha Lemari (Rak Simple and Easy Delivery) di Kecamatan Cikarang’, Jurnal Online Institut Teknologi Nasional, Jurusan Teknik Industri Itenas Bandung, No. 04, Vol. 01, PP 181-183.

Afandi, 2010, ‘Analisis Studi Kelayakan Investasi Pengembangan Usaha Distribusi PT. Aneka Andalan Karya’, Fakultas Ekonomi Universitas Gunadarma, PP 2-4.

Aningrum, W. W, 2015, ‘Analisis Kelayakan Investasi Pembukaan Cabang Rumah Makan Soto Banjar Nyaman Banar di Kabupaten Kutai Kartanegara’, eJournal Ilmu Administrasi Bisnis, Universitas Mulawarman Samarinda, PP 321-334.

Apple. M, James., 1990. Tata Letak Pabrik dan Pemindahan Bahan (Edisi Ketiga). ITB Bandung.

Fahmi, I. 2014. Studi Kelayakan Bisnis dan Keputusan Investasi (Edisi pertama, Halaman 317, 267, 269, 276, 278, 286, 287). Jakarta: Mitra Wacana Media.

Fauzi, M, 2012, ‘Analisis Kelayakan Usaha Dengan Menggunakan Multi Kriteria Penilaian Investasi (Studi Kasus : Pengembangan Maroon Cafe n’ Resto di Wilayah Panam, Pekanbaru)’, Skripsi Jurusan Teknik Industri UIN Suska Riau, PP 63-64.

Giatman, M. 2007. Ekonomi Teknik (Edisi Pertama, Halaman 129). Jakarta: Rajawali Pers.

Ibrahim,Y. 2009.Studi Kelayakan Bisnis (Edisi Revisi). Jakarta: Rineka Cipta.

Irfani, A, 2011, ‘Analisis Kelayakan Pengembangan Usaha Ransel Laptop di UMKM Yogi Tas Desa Laladon Kecamatan Ciomas Kabupaten Bogor’, Skripsi Jurusan Manajemen, Fakultas Ekonomi dan Manajemen, Istitut Pertanian Bogor, PP 6-17.

Kasmir & Jakfar. 2003. Studi Kelayakan Bisnis (Edisi Revisi, Halaman 5-8, 11-14, 18-20). Jakarta: Prenadamedia Group.


Refbacks

  • There are currently no refbacks.


FAKULTAS SAINS DAN TEKNOLOGI
UIN SUSKA RIAU

Kampus Raja Ali Haji
Gedung Fakultas Sains & Teknologi UIN Suska Riau
Jl.H.R.Soebrantas No.155 KM 18 Simpang Baru Panam, Pekanbaru 28293
Email: sntiki@uin-suska.ac.id